BACK TO PROJECTS
READ MOREREAD LESS
Mulgrave Country Club
This project required a standard application of Warning TGSI’s to the top and bottom of the paths of travel between two levels of this entry. Two TGSI areas of 600mm by the width in between the path of travel (in this case in between the handrails) were employed to give a clear tactile cue for both the approach and the alighting from the stair and ramp. For further detail and information see AS/NZS 1428.4 (2002).